[1]
Branco, F.J.C., Nagano, M.S. and Moccellin, J.V. 2008. Minimization of the program’s total duration in flowshop production systems, without interruption in task execution. Revista Gestão da Produção Operações e Sistemas. 2 (Jun. 2008), Pag. 39. DOI:https://doi.org/10.15675/gepros.v0i2.304.