Branco, Fábio José Ceron, Marcelo Seido Nagano, and João Vitor Moccellin. 2008. “Minimization of the program’s Total Duration in Flowshop Production Systems, Without Interruption in Task Execution”. Revista Gestão Da Produção Operações E Sistemas, no. 2 (June):Pag. 39. https://doi.org/10.15675/gepros.v0i2.304.