Production scheduling in no-wait flow shop system minimizing total flow time
DOI:
https://doi.org/10.15675/gepros.v0i1.215Abstract
This paper deals with the no-wait flow shop scheduling problem with the objective of minimizing total flow time, therefore reducing in-process inventory. Two news heuristic methods are proposed for the scheduling problem solution. The performance of the news methods are evaluated and compared with the best heuristic reported in the literature. Experimental results show the new methods superiority for the test problems set. Keywords: in-process inventory, no-wait flow shop, heuristics methods.Downloads
Published
How to Cite
Issue
Section
License
O(s) autor(es) do artigo autorizam a publicação do texto na revista e garantem que a contribuição é original e inédita, não estando em processo de avaliação em outra(s) revista(s). As opiniões, ideias e conceitos emitidos nos textos são de inteira responsabilidade do(s) autor(es), não sendo a revista responsável por tais conteúdos.
Os editores da revista reservam o direito de efetuar ajustes textuais e de adequação às normas da publicação, caso necessário.
Os autores mantêm os direitos autorais sobre o trabalho e concedem à revista o direito de primeira publicação, sendo o trabalho simultaneamente licenciado sob a Attribution 4.0 International (CC BY 4.0), o que permite o compartilhamento do trabalho com reconhecimento da autoria e publicação inicial nesta revista.
Os autores têm autorização para firmar contratos adicionais, separadamente, para distribuição não-exclusiva da versão do trabalho publicada nesta revista (ex.: publicar em repositório institucional ou como capítulo de livro), com reconhecimento de autoria e publicação inicial nesta revista.