Production scheduling in no-wait flow shop system minimizing total flow time

Authors

  • Lucas Yamada Scardoelli
  • Marcelo Seido Nagano
  • João Vitor Moccellin

DOI:

https://doi.org/10.15675/gepros.v0i1.215

Abstract

This paper deals with the no-wait flow shop scheduling problem with the objective of minimizing total flow time, therefore reducing in-process inventory. Two news heuristic methods are proposed for the scheduling problem solution. The performance of the news methods are evaluated and compared with the best heuristic reported in the literature. Experimental results show the new methods superiority for the test problems set. Keywords: in-process inventory, no-wait flow shop, heuristics methods.

Published

2008-03-01

How to Cite

Scardoelli, L. Y., Nagano, M. S., & Moccellin, J. V. (2008). Production scheduling in no-wait flow shop system minimizing total flow time. Revista Gestão Da Produção Operações E Sistemas, (1), Pag. 91. https://doi.org/10.15675/gepros.v0i1.215

Issue

Section

Articles