Purpose: the article aims to identify the main methods and tools used to study time and motion applied in the industry over the last 10 years.

Theoretical framework: with Industry 4.0 and the new technological tools, time and motion studies gain new methods of application. With this, given that the market is intensely competitive, to know the methods and tools used to apply it in companies over the last 10 years can give organizations a competitive edge.

Design/Methodology/Approach: This study is a systematic review of the literature – SRL. Analyzing articles found in Science Direct and on the Capes Website. International articles were chosen by searching terms and using established filters.

Findings: As a result, it was noted that, despite the importance of its effects, there are few academic papers written in the area being studied. The review incorporated 31 articles that have been published since 2010, which contained content related to the application of the concept. Two types of study were found: those that apply the time and motion study tool using stopwatches, clipboards and direct observation, and research that has been applied virtually.

Research, management & social implications: knowing the main methods and tools used in the study can improve the productivity of companies and the ergonomics of its employees, as well as assisting in constructing future research in the area.

Originality/Value: The study presents the development of the theme from Taylorism to the digital age, as well as the main methods and tools used by companies, which are important for the management of organizations and their competitiveness.

 

 

Biografia do Autor

Nicolle Christine Sotsek, UNIVERSIDADE FEDERAL DO PARANÁ/UFPR

Professora do curso de ENGENHARIA DE PRODUÇÃO UFPR

Referências

Al-Saleh, K. S. (2011). Productivity improvement of a motor vehicle inspection station using motion and time study techniques. Journal of King Saud University-Engineering Sciences, 23(1), 33-41. DOI: https://doi.org/10.1016/j.jksues.2010.01.001

Battini, D., Faccio, M., Persona, A., &Sgarbossa, F. (2011). New methodological framework to improve productivity and ergonomics in assembly system design. International Journal of industrial ergonomics, 41(1), 30-42. DOI: https://doi.org/10.1016/j.ergon.2010.12.001

Baraldi, E. C., & Paulo C, K. (2011). Ergonomic planned supply in an automotive assembly line. Human factors and ergonomics in manufacturing & service industries, 21(1), 104-119. DOI: https://doi.org/10.1002/hfm.20228

Barnes, R.M. Estudo de movimentos e de tempos: projeto e medida do trabalho. 6 ed. São Paulo: Edgar Blücher, 1977.

Bon, A.T;Daim, D; Time motion study in determination of time standard in manpower process, Proceedings of Engineering Conference on Advancement in Mechanical and Manufacturing for Sustainable Environment, Kuching, Sarawak, Malaysia, (2010).

Chaplin, L., Heap, J., & O'Rourke, S. T. (2016). Could “Lean Lite” be the cost effective solution to applying lean manufacturing in developing economies?. International Journal of Productivity and Performance Management. DOI: https://doi.org/10.1108/IJPPM-02-2015-0034

Di Gironimo, Giuseppe, et al. "Improving MTM-UAS to predetermine automotive maintenance times." International Journal on Interactive Design and Manufacturing (IJIDeM) 6.4 (2012): 265-273. DOI: https://doi.org/10.1007/s12008-012-0158-8

Duran, C., Cetindere, A., & Aksu, Y. E. (2015). Productivity improvement by work and time study technique for earth energy-glass manufacturing company. Procedia Economics and Finance, 26, 109-113. DOI: https://doi.org/10.1016/S2212-5671(15)00887-4

Gauniyal, A., Pant, K., & Agarwal, A. (2014). Time study model of a compact fluorescent lamp manufacturer in India: A case study. International Journal of Mechanical Engineering and Robotics Research, 11(1), 154-164.

George, M.L. Lean Six Sigma – Combining Six Sigma Quality with Lean Production Speed. McGraw Hill, New York, U.S.A. 2002.

Gopalakrishnan S.;Ganeshkumar P.;(2013), Jan;Systematic Reviews and Meta-analysis: Understanding the Best Evidence in Primary Healthcare;J Family Med Prim Care, 2(1):9-14. DOI: https://doi.org/10.4103/2249-4863.109934

Hanamant, K., Tushar, S., Aniket, K., Mahesh, H., & Vinod, M. (2017). Time and Motion Study for Reducing Cycle Time of Planetary Carrier. International Journal for Scientific Research & Development, 5(04), 321-613.

Jaiswal, A., Sane, S. M., &Karandikar, V. (2016). Improving Productivity in a Paint Industry using Industrial Engineering Tools and Techniques. International Journal of Advance Industrial Engineering, 4(11), 145-161.

Junior, L. C. D. A. R., & Chaves, C. A. (2012). Análise de posto de trabalho com aplicação do MTM como ferramenta para padronização de tempo. Exacta, 10(2), 167-179. DOI: https://doi.org/10.5585/exacta.v10n2.3881

Kitchenham,B; Brereton, O.P;Budgen,D; Turner, M; Bailey,J; Linkman,S; (2009); Systematic literature reviews in software engineering – A systematic literature review,Information and Software Technology, v. 51, Issue 1, p. 7-15. DOI: https://doi.org/10.1016/j.infsof.2008.09.009

Koptak, M., Džubáková, M., Vasilienė-Vasiliauskienė, V., &Vasiliauskas, AV (2017). Padrões de trabalho em operações de logística terceirizadas selecionadas: estudo de caso MTM-LOGISTICS. Procedia Engineering , 187 , 160-166. DOI: https://doi.org/10.1016/j.proeng.2017.04.428

Kuhlang, P., Edtmayr, T., &Sihn, W. (2011). Abordagem metódica para aumentar a produtividade e reduzir o tempo de espera nos processos de montagem e logística de produção. CIRP Journal of Manufacturing Science and Technology , 4 (1), 24-32. DOI: https://doi.org/10.1016/j.cirpj.2011.02.001

Kuhlang, P., &Sihn, W. HYBRID OPTIMISATION OF ADDED VALUE–A METHODICAL COMBINATION OF VALUE STREAM MAPPING AND MTM TO REDUCE LEAD TIME. International Journal of Production Research (2015).

Kunz, A., Zank, M., Nescher, T., & Wegener, K. (2016). Virtual reality based time and motion study with support for real walking. Procedia CIRP, 57, 303-308. DOI: https://doi.org/10.1016/j.procir.2016.11.053

Kurkin, O., & Bures, M. (2011, January). Evaluation of operational times by MTM methods in the digital factory environment. In Annals of DAAAM for 2011 & Proceedings of the 22nd International DAAAM Symposium, Vienna, Austria (pp. 0671-0672). DOI: https://doi.org/10.2507/22nd.daaam.proceedings.329

Lopetegui, M., Yen, P. Y., Lai, A., Jeffries, J., Embi, P., & Payne, P. (2014). Time motion studies in healthcare: what are we talking about?. Journal of biomedical informatics, 49, 292-299 DOI: https://doi.org/10.1016/j.jbi.2014.02.017

Loghin, M.C; Ionescu,I;Loghin,E.C;Dulgheriu,I;(2018); 13 - Use of advanced tools and equipment in industrial engineering,In The Textile Institute Book Series, Automation in Garment Manufacturing,Woodhead Publishing, p. 311-352. DOI: https://doi.org/10.1016/B978-0-08-101211-6.00013-6

Mori, V. V., Kanchava, Y. B., Karetha, P. A., &Charola, M. B. (2015). Productivity improvement by use of time study, motion study, lean tool’s and different strategy for assembly of automobile vehicles. International Journal for Scientific Research & Development, 3(2), 2321-613.

Negreiros, R.F; Lima, R.N. (2011). Projeto de engenharia de métodosnumafábrica de sorvetes. Seprone – Simpósio de Engenharia de Produção da RegiãoNordeste, v. 01, p.1 – 11.

Newell, S. (2015). Managing knowledge and managing knowledge work: what we know and what the future holds. JournalofInformation Technology, 30(1), 1-17. DOI: https://doi.org/10.1057/jit.2014.12

Roberto, M., Araújo, A., Varela, ML, Machado, J., & Mendonça, JP (2017, abril). Métodos de medição do tempo na otimização de um processo produtivo: um estudo de caso. Em 2017, 4ª Conferência Internacional sobre Controle, Decisão e Tecnologias de Informação (CoDIT) (pp. 0980-0985). IEEE.

Schwab, K.The Fourth Industrial Revolution.Currency, Illustrated edition (2017)

Sharma, A.K; Bhandari, R;Bretotean, C.P; Sharma, C;Dhakad, S.K; Mathur,A; A study of trends and industrial prospects of Industry 4.0; Materials Today: Proceedings,(2021). DOI: https://doi.org/10.1016/j.matpr.2021.04.321

Slack, N; Chambers, S; Johnston, R;Operations Management; Prentice Hall/Financial Times; (2007).

Taylor, F.W. The principles of scientific management. New York and London, Harper & Brothers Publishers, (1914).

Tilahun, H., Fekadu, B., Abdisa, H., Canavan, M., Linnander, E., Bradley, E. H., & Berman, P. (2017). Ethiopia’s health extension workers use of work time on duty: time and motion study. Health policy and planning, 32(3), 320-328. DOI: https://doi.org/10.1093/heapol/czw129

Trochim, W. M., &McLinden, D. (2017). Introduction to a special issue on concept mapping. Evaluation and program planning, 60, 166-175. DOI: https://doi.org/10.1016/j.evalprogplan.2016.10.006

Whitmore, D.A;Work Measurement;Butterworth-Heinemann Ltd; issue 2; (1987).

Downloads

Publicado

2022-09-27

Como Citar

Sotsek, N. C., Vivan, M. F., & De Oliveira, A. R. (2022). Time and motion study in the industry 4.0 era: A systematic review of the literature. Revista Gestão Da Produção Operações E Sistemas, 17(3), 01. https://doi.org/10.15675/gepros.v17i3.2879

Edição

Seção

Artigos

Artigos mais lidos pelo mesmo(s) autor(es)